| Infrastructure Component | T1 Farmville | T2 Wilson | T3 La Grange |
|---|---|---|---|
| Phase 1 MW Capacity | 5 MW | 5 MW | 2.5MW |
| Phase 1 Reliability | OK | Average | Poor |
| Phase 2 MW Capacity | 10 MW* | 10 MW* | 5 MW |
| Phase 2 Reliability | Good | Good | OK* |
| Phase 1 Natural Gas Service | Yes | Yes | No |
| Phase 2 Natural Gas Service | Yes | Yes | Possible* |
| Diesel Gas Storage Required? | TBD | TBD | TBD |
| Reclaim Water Capacity | 0.25 MGD* | > 0.25 MGD | None |
| Reclaim Water Reliability | OK* | OK | |
| Backup and Fire Water | OK | OK | Poor |
Individual Site Profiles
T1 Farmville
Power Capacity
Phase 1: 5 MW
Phase 2: 10 MW*
Reliability
Phase 1: OK
Phase 2: Good
Natural Gas
Phase 1: Yes
Phase 2: Yes
Water Infrastructure
Reclaim: 0.25 MGD*
Backup/Fire: OK
T2 Wilson
Power Capacity
Phase 1: 5 MW
Phase 2: 10 MW*
Reliability
Phase 1: Average
Phase 2: Good
Natural Gas
Phase 1: Yes
Phase 2: Yes
Water Infrastructure
Reclaim: > 0.25 MGD
Backup/Fire: OK
T3 La Grange
Power Capacity
Phase 1: 2.5MW
Phase 2: 5 MW
Reliability
Phase 1: Poor
Phase 2: OK*
Natural Gas
Phase 1: No
Phase 2: Possible*
Water Infrastructure
Reclaim: None
Backup/Fire: Poor
Site Analysis Summary
Key Advantages by Site
T1 Farmville
Good Phase 2 reliability, natural gas availability, adequate water capacity
T2 Wilson
Highest water capacity, good overall reliability, best infrastructure balance
T3 La Grange
Lower capacity option for smaller deployments, cost-effective entry point
Critical Considerations
Diesel storage requirements need determination (TBD) for all sites
T3 La Grange has limited infrastructure capabilities
Phase 2 expansions marked with * require further validation
Natural gas service varies significantly by location